Procedures
Concrete
Preparation
Procedures
Concrete Coating
Application Procedures

Apply Base coat
The base coat is evenly spread over the concrete with a squeegee followed by a back rolling of the product using a 3/8 nap paint roller to ensure even distribution and full coverage.
Full Flake distribution
Immediately after base coat is applied, the full flake system is broadcasted over the top which soaks and bonds in to the base coat.
Scrap Excess Flakes & Vacuum Clean
The floor is cured for two hours. The loose flakes are then scraped in two directions and the excess is vacuumed up to prepare for the top clear coat.
Apply Top Clear Coat
A top clear coat is applied over the entire floor system. The clear coat is squeegeed out and back rolled using a 3/8 nap roller to ensure an even, complete coverage of material.
Anti–Slip Silica Additive (Optional)
Anti-slip silica can be added to the clear coat, adding additional grip and texture to your floor system.